中国大胆老太性视频HD_影视在线观看三级综合_久久精品国产首叶15_老子影院午夜伦手机不卡_亚洲伦理日韩无码_亚洲av永久无码精品_欧美暴力深喉囗交_黄色软件导航_一个人免费观看www视频二_亚洲欧美一区二区少妇

您的瀏覽器版本過(guò)低,為保證更佳的瀏覽體驗(yàn),請(qǐng)點(diǎn)擊更新高版本瀏覽器

以后再說(shuō)X

歡迎訪問(wèn)瑞昌明盛自動(dòng)化設(shè)備有限公司網(wǎng)站!

圖片名

全國(guó)訂購(gòu)熱線:
+86 15270269218E-mail:[email protected]

ABB >>

A-B>>

GE>>

BENTLY>>

PB3-VME-2-E

PB3-VME-2-E

PB3-VME-2-E控制器模塊,SST使用參數(shù)本章提供了以下方面的說(shuō)明:? 打開(kāi)設(shè)備包裝? 準(zhǔn)備硬件? 安裝MVME187 RISC單板計(jì)算機(jī)請(qǐng)注意,MVME712X的硬件準(zhǔn)備說(shuō)明轉(zhuǎn)換模塊在各自的用戶手冊(cè)中提供模型請(qǐng)參閱隨附的用戶手冊(cè)MVME712X。打開(kāi)設(shè)備包裝注意:如果裝運(yùn)紙箱在收到后損壞,請(qǐng)請(qǐng)求開(kāi)包期間承運(yùn)人代理人在場(chǎng)以及設(shè)備的檢查。將設(shè)備從裝運(yùn)箱中取出。PB3-VME-2-E控制器模塊請(qǐng)...

  • 功能特性
  • 參數(shù)規(guī)格
  • 視頻
  • 應(yīng)用案例
  • 下載

PB3-VME-2-E

    PB3-VME-2-E控制器模塊,SST使用參數(shù)

    本章提供了以下方面的說(shuō)明:

    ? 打開(kāi)設(shè)備包裝

    ? 準(zhǔn)備硬件

    ? 安裝MVME187 RISC單板計(jì)算機(jī)請(qǐng)注意,MVME712X的硬件準(zhǔn)備說(shuō)明轉(zhuǎn)換模塊在各自的用戶手冊(cè)中提供模型請(qǐng)參閱隨附的用戶手冊(cè)MVME712X。

    打開(kāi)設(shè)備包裝注意:如果裝運(yùn)紙箱在收到后損壞,請(qǐng)請(qǐng)求開(kāi)包期間承運(yùn)人代理人在場(chǎng)以及設(shè)備的檢查。將設(shè)備從裝運(yùn)箱中取出。

    SST-PFB3-VME SST-PFB3-VME-2-E PB3-VME-2-E -1.jpg

    PB3-VME-2-E控制器模塊請(qǐng)參閱裝箱單并確認(rèn)所有物品均已存在。保存包裝設(shè)備儲(chǔ)存和重新裝運(yùn)的材料。下表列出了您之前需要做的事情你可以使用這個(gè)板,在哪里可以找到你需要的信息執(zhí)行每個(gè)步驟。請(qǐng)務(wù)必閱讀本章和所有注意事項(xiàng)

    注意事項(xiàng),并在您之前隨身攜帶相關(guān)文檔開(kāi)始下表列出了您之前需要做的事情你可以使用這個(gè)板,在哪里可以找到你需要的信息執(zhí)行每個(gè)步驟。請(qǐng)務(wù)必閱讀本章和所有注意事項(xiàng)注意事項(xiàng),并在您之前隨身攜帶相關(guān)文檔開(kāi)始本節(jié)包括:

    ? 安裝前修改硬件配置

    ? 檢查187Bug EPROM

    ? 出廠跳線設(shè)置

    ? 準(zhǔn)備MVME187

    ? 準(zhǔn)備系統(tǒng)機(jī)箱安裝前修改配置選擇所需配置并確保對(duì)于MVME187,可能需要進(jìn)行某些選項(xiàng)修改安裝前。開(kāi)關(guān)、跳線頭、接頭和LED的位置MVME187上的指示器如圖3-1所示。選項(xiàng)修改

    MVME187規(guī)定了通過(guò)以下方式修改期權(quán):

    ? 大多數(shù)選項(xiàng)的軟件控制

    ? 某些選項(xiàng)標(biāo)題上的跳線設(shè)置

    ? most安裝后控制寄存器中的位設(shè)置其他選項(xiàng)–控制寄存器在單板中描述

    計(jì)算機(jī)程序員參考指南,如相關(guān)本手冊(cè)第1章中的文件。

    corresponding time arrives, it will be triggered respectively: the next tank of aggregate batching, feeding of cement, water and chemicals, lowering of hopper, start of mixing timer. When the cement feeding time arrives, close the unloading butterfly valve and trigger the next cement batching. When the feeding time of water and reagent arrives, close the solenoid valve, stop the booster pump and trigger the next filling and reagent batching. When the hopper drops to the lower limit, it will stop automatically and wait for the feeding of aggregate belt.


    3. Mixing and unloading concrete: when the mixing time arrives, open the concrete unloading door and start the unloading timer. When the time arrives, it will be closed automatically, and the output data will be counted at the same time.


    During operation: (vehicle capacity) the last tank of concrete batching is completed, the system is closed, the batching trigger is triggered, and batching is no longer required. After the unloading of the last tank of concrete is completed, the system disconnects the automatic operation contact and returns to the standby state.


    Conclusion:


    The system has the advantages of simple structure and convenient operation and maintenance. It is suitable for small concrete mixing plants on the construction site. However, it still has shortcomings. With the development of modern science and technology, electronic belt scale and liquid flowmeter have also been widely used. The introduction of new technology to further simplify the system structure, mechanical structure and metal structure is a new idea to improve the performance of equipment. After the machine is started, count every time a sealing and cutting action is completed. After the power is turned on, the counter is automatically cleared. 7) Stop positioning function: when the machine is stopped in any state, the heat seal body is in the open position to avoid scalding the packaging materials. 8) Automatic shutdown and alarm function: in case of paper break, no paper and bag jam, it will automatically stop and alarm. That is, when the packaging material breaks or the packaging material is used up (see Fig. 8 for paper breaking detection) and the packaging bag accumulates above the cutter (see Fig. 10 for bag jamming detection), the machine will automatically stop and give an alarm to prompt the operator to deal with it. Carefully understand the input and output equipment, check the location and name of the sensor and the relationship with the output equipment. 3) understand the safety protection measures and fault alarm in the control process. 4) prepare the program in line with the control process. 5) commissioning program. 5 Use logo! 6. No design circuit diagram / wiring diagram LOGO! Control program development 1) control program of main motor


    The bag pulling motor of the particle packaging machine uses a stepping motor driver to control the bag pulling time and length. In the logo, there is no corresponding function block, so in the program I designed, the control of bag pulling motor needs to be improved. 2) Other control logos of this model of particle packaging machine can be basically realized. However, due to the large number of digital signal inputs required in the control process, more expansion blocks are required. This change will reduce the cost. 3) The particle packaging machine has strict requirements on the heating temperature of heat seal. Considering that the cost will be increased if the input quantity is continuously increased, and this model of packaging machine can be well realized through simple control, the input of analog quantity is not considered in this project.


    品牌:SST

    型號(hào):SST-PFB3-VME-2-E

    產(chǎn)地:美國(guó)

    質(zhì)保:365天

    成色:全新/二手

    發(fā)貨方式:快遞發(fā)貨


圖片名 客服

在線客服 客服一號(hào)