MVME177P-54SE模塊備件
地板的設(shè)計(jì)和建造必須保證對儲存物質(zhì)的滲透率為1 x 10-6 cm/sec或更低;以及(iv)容器的設(shè)計(jì)和制造必須符合國家認(rèn)可協(xié)會或獨(dú)立測試實(shí)驗(yàn)室制定的一致準(zhǔn)則、標(biāo)準(zhǔn)或慣例,并適合于儲存的物質(zhì)和儲存條件。本規(guī)定不適用于經(jīng)陳述、標(biāo)記、認(rèn)證或銷售的符合危險(xiǎn)物質(zhì)運(yùn)輸條件且符合適用聯(lián)邦要求的容器;以及(v)容器必須存放在穩(wěn)定位置。如果堆放此類集裝箱,則必須將其堆放在穩(wěn)定的平臺或托盤上。(2) 正在運(yùn)輸或在中轉(zhuǎn)區(qū)停留不到五天的集裝箱,以及在現(xiàn)場停留不超過180天的有軌車和卡車拖車,不受本小節(jié)第(1)款的儲存要求的限制。(3) 從1996年8月11日開始,容器必須滿足以下要求:(i)每個(gè)容器必須貼有標(biāo)簽,以識別其內(nèi)容物;以及(ii)必須為儲存在集裝箱儲存區(qū)內(nèi)的所有集裝箱保存庫存記錄。此類記錄必須包括容器的數(shù)量和每個(gè)容器的內(nèi)容。598.6地下儲罐系統(tǒng)——測試和檢查。(a) 輔助設(shè)備的測試和檢查。自1995年8月11日起,業(yè)主或運(yùn)營商必須按照以下要求檢查輔助設(shè)備:6 NYCRR第598部分–2015年10月11日第12頁,
(1)必須每月檢查通風(fēng)孔、泄壓裝置、儀表、警報(bào)器、防溢流設(shè)備、陰極保護(hù)監(jiān)測設(shè)備、其他監(jiān)測設(shè)備、警告警報(bào)器和安全系統(tǒng)。必須目視檢查設(shè)備的清潔度、泄漏、腐蝕和可操作性。(2) 必須對自動管線泄漏檢測器和陰極系統(tǒng)進(jìn)行年度測試,以確保設(shè)備正常運(yùn)行,從而保護(hù)受腐蝕的儲罐或管道。陰極保護(hù)系統(tǒng)必須由合格的技術(shù)人員進(jìn)行檢查,以確保存在足夠的結(jié)構(gòu)到電解質(zhì)的電位,以防腐蝕。如果任何管線泄漏檢測器或陰極保護(hù)系統(tǒng)未能提供必要的保護(hù),則必須根據(jù)本部分第598.9(a)(2)節(jié)采取措施。(b) 地下儲罐泄漏檢測。從1995年8月11日開始,業(yè)主和運(yùn)營商必須使用以下一種或多種方法檢查地下儲罐的泄漏情況:(1)如果每月檢測到1%的流量加130加侖的泄漏,并且每年進(jìn)行一次密封性測試,則可以使用庫存監(jiān)控。庫存監(jiān)控必須按照40 CFR第280.43(a)節(jié)(見本部分第598.1[j]節(jié))中規(guī)定的標(biāo)準(zhǔn)進(jìn)行。(2) 可以使用壓力監(jiān)測、真空監(jiān)測、電子監(jiān)測或手動取樣來對雙壁罐的間隙空間進(jìn)行每周監(jiān)測。(3) 可使用蒸汽井監(jiān)測開挖區(qū)的土壤。
The floor must be designed and constructed so that the permeability to the stored material is 1 x 10-6 cm/sec or less; And (iv) containers must be designed and manufactured in accordance with consistent codes, standards or practices established by the National Accreditation Society or independent testing laboratories, and suitable for the substances and storage conditions being stored. This provision does not apply to containers that are stated, marked, certified, or sold in compliance with the conditions for transportation of hazardous substances and meet applicable federal requirements; And (v) the container must be stored in a stable position. If such containers are stacked, they must be stacked on stable platforms or pallets. (2) Containers that are being transported or remain in the transit area for less than five days, and railcars and truck trailers that remain on site for less than 180 days, are not subject to the storage requirements of paragraph (1) of this subsection. (3) As of August 11, 1996, containers must meet the following requirements: (i) Each container must be labeled to identify its contents; And (ii) must maintain inventory records for all containers stored in the container storage area. Such records must include the number of containers and the contents of each container. 598.6 Underground Storage Tank Systems - Testing and Inspection. (a) Testing and inspection of auxiliary equipment. From August 11, 1995, the owner or operator must inspect the auxiliary equipment in accordance with the following requirements: 6 NYCRR Part 598 – October 11, 2015 Page 12,
(1) Vents, pressure relief devices, instruments, alarms, anti overflow equipment, cathodic protection monitoring equipment, other monitoring equipment, warning alarms and safety systems must be inspected monthly. The equipment must be visually inspected for cleanliness, leaks, corrosion and operability. (2) The automatic line leak detector and cathodic system must be tested annually to ensure proper operation of the equipment to protect the corroded tank or pipeline. The cathodic protection system must be checked by qualified technicians to ensure that there is enough potential from the structure to the electrolyte to prevent corrosion. If any pipeline leakage detector or cathodic protection system fails to provide necessary protection, measures must be taken according to section 598.9 (a) (2) of this part. (b) Leakage detection of underground storage tank. From August 11, 1995, owners and operators must use one or more of the following methods to check the leakage of underground storage tanks: (1) If 1% of the flow plus 130 gallons of leakage is detected every month, and the leak tightness test is conducted once a year, inventory monitoring can be used. Inventory monitoring must be conducted in accordance with the standards specified in 40 CFR Section 280.43 (a) (see 598.1 [j] of this part). (2) The clearance space of the double wall tank can be monitored weekly using pressure monitoring, vacuum monitoring, electronic monitoring or manual sampling. (3) A steam well can be used to monitor the soil in the excavation area.