中国大胆老太性视频HD_影视在线观看三级综合_久久精品国产首叶15_老子影院午夜伦手机不卡_亚洲伦理日韩无码_亚洲av永久无码精品_欧美暴力深喉囗交_黄色软件导航_一个人免费观看www视频二_亚洲欧美一区二区少妇

您的瀏覽器版本過低,為保證更佳的瀏覽體驗,請點擊更新高版本瀏覽器

以后再說X

歡迎訪問瑞昌明盛自動化設(shè)備有限公司網(wǎng)站!

圖片名

全國訂購熱線:
+86 15270269218E-mail:[email protected]

ABB >>

A-B>>

GE>>

BENTLY>>

MVME177-012控制卡件

MVME177-012控制卡件

MVME177-012控制卡件這必須包括腐蝕和腐蝕磨損的測量以及電偶腐蝕、晶間腐蝕、應(yīng)力腐蝕開裂、設(shè)備腐蝕、點蝕、蜂窩狀腐蝕的評估,以及材料不相容性的檢查;目視檢查儲罐內(nèi)表面和難以觸及的腐蝕或故障區(qū)域;以及檢查內(nèi)部和外部襯里、覆層和涂層是否有任何故障跡象,如裂縫、氣泡、氣泡、剝落、卷曲或分離。 未經(jīng)檢查的設(shè)施。如果儲罐系統(tǒng)的任何部分未按要求進行檢查,則所有者或操作員必須根據(jù)本部分第598.10節(jié)的...

  • 功能特性
  • 參數(shù)規(guī)格
  • 視頻
  • 應(yīng)用案例
  • 下載

MVME177-012控制卡件

    MVME177-012控制卡件

    這必須包括腐蝕和腐蝕磨損的測量以及電偶腐蝕、晶間腐蝕、應(yīng)力腐蝕開裂、設(shè)備腐蝕、點蝕、蜂窩狀腐蝕的評估,以及材料不相容性的檢查;目視檢查儲罐內(nèi)表面和難以觸及的腐蝕或故障區(qū)域;以及檢查內(nèi)部和外部襯里、覆層和涂層是否有任何故障跡象,如裂縫、氣泡、氣泡、剝落、卷曲或分離。 未經(jīng)檢查的設(shè)施。如果儲罐系統(tǒng)的任何部分未按要求進行檢查,則所有者或操作員必須根據(jù)本部分第598.10節(jié)的要求將未經(jīng)檢查的系統(tǒng)部分停止使用。598.8記錄保存。記錄保存。本部分第598.6節(jié)和第598.7節(jié)要求的每個月、年或五年試驗或檢查的報告必須與防泄漏報告一起保存,并應(yīng)要求保存并提供給部門。年度檢查記錄必須保存五年。其他檢查或測試的報告必須保存10年。日常檢查無需記錄。 報告。所有報告必須包括以下信息:設(shè)施注冊號; 測試或檢查的儲罐、管道或設(shè)備的識別號;測試或檢驗日期;測試和檢查結(jié)果,包括管道、儲罐和輔助設(shè)備狀況、預期使用壽命和維修需求報告;6 NYCRR第598部分–2015年10月11日第18頁使用的測試和檢查方法;工程師或技術(shù)人員的證明,證明測試或檢驗已按照本部分要求進行; 工程師或技術(shù)人員資格聲明; 工程師或技術(shù)人員的姓名;工程師或技術(shù)人員的營業(yè)地址;以及工程師或技術(shù)人員的簽名。598.9設(shè)施的維護和維修。維修。 必須立即采取行動,防止即將釋放。如果任何檢查表明繼續(xù)操作或?qū)嵺`將導致泄漏,或儲罐系統(tǒng)或其任何部分不充分或不嚴密,則必須修改或停止操作或?qū)嵺`。必須立即更換、修理或停止使用儲罐系統(tǒng)或其任何部分??赡鼙砻骷磳l(fā)生泄漏的示例包括但不限于:泄漏的閥門、泵和管道接頭、故障的壓力或真空釋放裝置、不適當?shù)膬x表、密封性試驗失敗、儲罐外殼過度變?。ㄟ@表明儲罐填充時存在結(jié)構(gòu)缺陷)以及故障的壓力計或溫度計。

    This must include measurement of corrosion and corrosion wear, evaluation of galvanic corrosion, intergranular corrosion, stress corrosion cracking, equipment corrosion, pitting corrosion, honeycomb corrosion, and inspection of material incompatibility; Visually inspect the internal surface of the tank and the corrosion or fault areas that are difficult to reach; And inspect the internal and external linings, coatings and coatings for any signs of failure, such as cracks, bubbles, bubbles, peeling, curling or separation. Uninspected facilities. If any part of the tank system is not inspected as required, the owner or operator must remove the uninspected part of the system from service in accordance with section 598.10 of this part. 598.8 Record keeping. Record keeping. The monthly, annual or five-year test or inspection report required by 598.6 and 598.7 of this part must be kept together with the leakage prevention report, and kept and provided to the department upon request. Annual inspection records must be kept for five years. Reports of other inspections or tests must be kept for 10 years. Daily inspection does not need to be recorded. report All reports must include the following information: facility registration number; Identification number of the tank, pipeline or equipment tested or inspected; Date of test or inspection; Test and inspection results, including reports on the condition, expected service life and maintenance requirements of pipelines, tanks and auxiliary equipment; 6 Test and inspection methods used in NYCRR Part 598 – Page 18 of October 11, 2015; The engineer or technician's certificate that the test or inspection has been conducted in accordance with the requirements of this part; Qualification statement of engineers or technicians; Name of engineer or technician; Business address of engineers or technicians; And the signature of the engineer or technician. 598.9 Maintenance and repair of facilities. repair. Immediate action must be taken to prevent imminent release. If any inspection shows that continued operation or practice will lead to leakage, or the tank system or any part thereof is inadequate or not tight, the operation or practice must be modified or stopped. The tank system or any part of it must be replaced, repaired or taken out of service immediately. Examples that may indicate an impending leak include, but are not limited to, leaking valves, pump and pipe connections, faulty pressure or vacuum relief devices, improper instrumentation, failure of the leak tightness test, excessive thinning of the tank shell (which indicates a structural defect when the tank is filled), and faulty pressure gauges or thermometers.

    fa405aeea632aa6912154382925a28b_副本.jpg

    ABB 5SHY4045L0006.jpg

    3BHB005243R0105.jpg

    13.jpg



    品牌:  Motorola 

    型號:MVME177-012 

    產(chǎn)地:美國

    質(zhì)保:365天

    成色:全新/二手

    發(fā)貨方式:快遞發(fā)貨


圖片名 客服

在線客服 客服一號