中国大胆老太性视频HD_影视在线观看三级综合_久久精品国产首叶15_老子影院午夜伦手机不卡_亚洲伦理日韩无码_亚洲av永久无码精品_欧美暴力深喉囗交_黄色软件导航_一个人免费观看www视频二_亚洲欧美一区二区少妇

您的瀏覽器版本過低,為保證更佳的瀏覽體驗,請點擊更新高版本瀏覽器

以后再說X

歡迎訪問瑞昌明盛自動化設(shè)備有限公司網(wǎng)站!

圖片名

全國訂購熱線:
+86 15270269218E-mail:[email protected]

主頁 > 資訊公告 > 產(chǎn)品資訊

產(chǎn)品資訊
產(chǎn)品資訊 行業(yè)資訊 工控詢價

MAESTRO 60X7/14伺服驅(qū)動模塊

作者:xqt 發(fā)布時間:2022-07-05 13:48:52 次瀏覽

MAESTRO 60X7/14伺服驅(qū)動模塊,MINI使用尺寸過電壓保護電子關(guān)機電路可防止電壓超過6.2伏。備用電壓鉗是用于防止持續(xù)過電壓由外部影響或內(nèi)部影響引起的條件故障。內(nèi)部故障引起的過電壓可能導(dǎo)致保險絲斷開。對于短期過電壓情況,當(dāng)原因為遠(yuǎn)離的。每個傳感器上都提供了電子電流限制三個輸出。任何輸出過載都會導(dǎo)致電壓崩潰,并可能導(dǎo)致其他輸出電壓崩潰。MAESTRO 60X7/14伺服驅(qū)動模塊拆卸后將恢

MAESTRO 60X7/14伺服驅(qū)動模塊,MINI使用尺寸

過電壓保護電子關(guān)機電路可防止電壓超過6.2伏。備用電壓鉗是用于防止持續(xù)過電壓由外部影響或內(nèi)部影響引起的條件故障。內(nèi)部故障引起的過電壓可能導(dǎo)致保險絲斷開。對于短期過電壓情況,當(dāng)原因為遠(yuǎn)離的。每個傳感器上都提供了電子電流限制三個輸出。任何輸出過載都會導(dǎo)致電壓崩潰,并可能導(dǎo)致其他輸出電壓崩潰。

MAESTRO 60X714 -3.jpg

MAESTRO 60X714.jpg

MAESTRO 60X714 -2.jpg

MAESTRO 60X7/14伺服驅(qū)動模塊拆卸后將恢復(fù)正常操作超載。在恢復(fù)正常運行之前,可能需要一些設(shè)備冷卻時間。雙機架操作一個電源可以為兩個人供電以下條件下的機架:

第二個機架只需要5伏電源,兩個機架所需的總功率與電源容量有關(guān)。第二個機架消耗的電流小于5.2安培。兩個機架必須緊密安裝受可用3英尺連接電纜的限制。用于雙機架操作的連接電纜為表1中列出了訂購信息。該電纜車包括+5伏電源總線和電源對信號進行排序。它使用9針D型連接器它通過一個機架中的開口。注意,電纜承載僅限功率和功率排序信號。機架間通信和總線接口模塊必須單獨提供。參見適用的可編程控制器安裝手冊。有關(guān)應(yīng)用程序信息。系統(tǒng)重置。5VSTBY輸出可用于用戶電池備份方案如圖所示。通電時,ACFAIL信號出錯5伏總線在規(guī)格范圍內(nèi)后不久。SYSRESET將系統(tǒng)保持在重置狀態(tài)至少5伏電源可用后200毫秒(期間這一次,輸出被強制關(guān)閉)。如果交流輸入電源中斷,5伏總線將在規(guī)格范圍內(nèi)重新供電至少一個周期。這個然后,在SYSRESET停止所有操作之前,給系統(tǒng)額外5毫秒的時間來完成有序關(guān)機處理。

Overvoltage Protection

An electronic shutdown circuit protects against voltages exceeding 6.2 volts. A back-up voltage clamp is

provided to protect against sustained overvoltage

conditions due to either external influences or internal

faults. Overvoltage due to internal faults may cause

the fuse to open. For short term overvoltage conditions, normal operation will resume when the cause is

removed.An electronic current limit is provided on each of the

three outputs. An overload on any output will cause

the voltage to collapse and may cause the other output voltages to collapse.

Normal operation will resume after removal of the

overload. Some component cooling time may be required before normal operation resumes.Dual Rack Operation

A single power supply can provide power for two

racks under the following conditions:

 Only 5 volt power is required in the second rack,

and the total power required by both racks is within the capability of the supply.

 The current drawn by the second rack is less than

5.2 amperes.

 The two racks must be mounted in close proximity

as limited by the available 3-foot connecting cable.

The connecting cable used for dual rack operation is

listed in Table 1, Ordering Information. This cable carries the +5 volts power bus as well as the power

sequencing signals. It uses a 9-pin D-type connector

which connects directly to the backplane through an

opening in the rack frame. Note that the cable carries

power and power sequencing signals only. Inter-rack

communication and bus interface modules must be provided separately. See the applicable Programmable

Controller Installation Manual. for application information.SYSRESET. The 5VSTBY output may be used for user

battery backup schemes as shown.

On application of power, the ACFAIL signal goes false

soon after the 5 volt bus is within specification. The system is held in the Reset state by SYSRESET for at least

200 milliseconds after 5 volt power is available (during

this time, outputs are forced off).


圖片名 客服

在線客服 客服一號